Access REC Project Portal

Tyson Foods – Temperanceville, VA

2.3 MGD Biological Nutrient Removal Wastewater Treatment System Upgrade

Reid Engineering was the Prime Engineer that provided all civil and environmental engineering services for 1.50 MGD WWTP Upgrade Four Stage Bardenpho Activated Sludge ENR System with Tertiary Filtration designed to meet TN = 6mg/L and TP = 0.3mg/L.

More specifically, the New 2.3 MGD WWTP Upgrade consists of the following components:

  • Anaerobic 7 Day Flow Equalization Lagoon
  • Anoxic Lagoon
  • 2nd Stage Aerobic Nitrification Reactor
  • 3rd Stage Anoxic Reactor
  • 4th Stage Aerobic Reactor
  • Aluminum Sulfate dosage for final Phosphorus removal
  • Tertiary Filters and Building
  • UV Disinfection System
  • Wastewater Equipment Building