JBS USA – Souderton, PA
1.0 MGD Enhanced Phosphorus Removal & Renewable Energy Wastewater Treatment System Upgrade
![]() |
![]() |
![]() |
Reid Engineering was the Prime Engineer that provided all civil and environmental engineering services for the 1.00 MGD WWTP Upgrade (with influent wastewater TN =200 to 250 mg/L and TP = 30 to 40 mg/L) Single Stage Activated Sludge with Tertiary Filters System designed to meet TP = 0.1mg/L.
More specifically, the WWTP Upgrade consists of the following components:
- 7 Day Flow Equalization/Anaerobic Lagoon
- Anaerobic Lagoon Effluent Pump Station
- Aerobic Reactor Modifications
- WAS Storage Tank
- Final Clarifier Modifications
- UV
- Tertiary Filtration System
- Filter Reject Wastewater Pump Station
- Thickened Sludge Pump Station & WSST Decant Pump
- Chemical Equipment and System
- Biogas Generation System including Cover, Pumps, Blowers and Flare
- SCADA Control System