Access REC Project Portal

JBS USA – Souderton, PA

1.0 MGD Enhanced Phosphorus Removal & Renewable Energy Wastewater Treatment System Upgrade

Reid Engineering was the Prime Engineer that provided all civil and environmental engineering services for the 1.00 MGD WWTP Upgrade (with influent wastewater TN =200 to 250 mg/L and TP = 30 to 40 mg/L) Single Stage Activated Sludge with Tertiary Filters System designed to meet TP = 0.1mg/L.

More specifically, the WWTP Upgrade consists of the following components:

  • 7 Day Flow Equalization/Anaerobic Lagoon
  • Anaerobic Lagoon Effluent Pump Station
  • Aerobic Reactor Modifications
  • WAS Storage Tank
  • Final Clarifier Modifications
  • UV
  • Tertiary Filtration System
  • Filter Reject Wastewater Pump Station
  • Thickened Sludge Pump Station & WSST Decant Pump
  • Chemical Equipment and System
  • Biogas Generation System including Cover, Pumps, Blowers and Flare
  • SCADA Control System