Reid Engineering was the Prime Engineer that provided all civil and environmental engineering services for the New 1.05 MGD Wastewater Pretreatment Plant for BOD, TSS and Oil/Grease Removal.

More specifically, the New Pretreatment Plant consists of the following components:

  • Screens
  • DAF Clarifier (s)
  • 400,000 Gal Equalization Basin
  • Influent/Effluent Pump Stations
  • RAS/WAS Pump Station
  • Sludge Pump Station with Sludge Storage Tanks
  • Trickling Media Filter System
  • Chemical Equipment and System
  • SCADA Control System

Project Highlights:  REC saved the Owner over 4+ million dollars based on a previous design and estimate by others.