Frito Lay – Jonesboro, AR
New 1.05 MGD High Rate Activated Sludge Wastewater Pretreatment Plant
![]() |
![]() |
Reid Engineering was the Prime Engineer that provided all civil and environmental engineering services for the New 1.05 MGD Wastewater Pretreatment Plant for BOD, TSS and Oil/Grease Removal.
More specifically, the New Pretreatment Plant consists of the following components:
- Screens
- DAF Clarifier (s)
- 400,000 Gal Equalization Basin
- Influent/Effluent Pump Stations
- RAS/WAS Pump Station
- Sludge Pump Station with Sludge Storage Tanks
- Trickling Media Filter System
- Chemical Equipment and System
- SCADA Control System
Project Highlights: REC saved the Owner over 4+ million dollars based on a previous design and estimate by others.