Campbell Soup Company – Maxton, NC

Campbell Soup Company – Maxton, NC – 4 MGD Pretreatment System Upgrade

Campbells 1 Campbells 2

Reid Engineering was the Prime Engineer that provided all civil and environmental engineering services for  Maxton Facilities 4 MGD Wastewater Pretreatment Plant Upgrade that consisted of the design and installation two new rectangular stainless steel Dissolved Air Floatation (DAF) Cells to replace the single existing deteriorated carbon steel circular DAF cell to continue to provide pretreatment of wastewater grit, Oil and Grease, and Suspended Solids prior to final disposal by of wastewater spray irrigation on existing permitted spray fields.

More specifically, the Upgraded Pretreatment Plant consists of the following components:

  • New Influent Piping
  • Influent Flow Splitter Box
  • Two New 4,900 gpm DAF Cells
  • Two New 18,000 gallon Sludge Holding Tanks with Sludge Pumps and Mixers
  • Grit Removal/Dewatering System and Building
  • SCADA Control System